Share this article
The U.S. Environmental Protection Agency has selected a cleanup plan for the first mile of the Lower Neponset River Superfund Site, located in Boston and Milton, Massachusetts.

Share this article
The U.S. Environmental Protection Agency has selected a cleanup plan for the first mile of the Lower Neponset River Superfund Site, located in Boston and Milton, Massachusetts.
Dredging Today is read by thousands of professionals every day.
Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.
Join thousands of industry professionals who start their day with our newsletter.
This covers the area of the Neponset River from where it merges with the Mother Brook near the Dana Avenue Bridge, to the Tileston and Hollingsworth Dam.
The cleanup plan includes dredging and excavating contaminated sediment and floodplain soil with total PCB levels exceeding 1 part per million.
EPA will also construct a permanent cap in the first mile of the river to stabilize and restore the riverbed, minimizing surface water elevation changes, providing habitats, and isolating any remaining contamination in deeper sediment.
Cleanup design will begin in 2026, and construction is anticipated to begin in 2027. The removal action is estimated to take approximately four years to complete.
10 days ago
about 8 months ago
The U.S. Environmental Protection Agency has selected a cleanup plan for the first mile of the Lower Neponset River Superfund Site, located in Boston and Milton, Massachusetts. This covers the area of the Neponset River from where it merges with the Mother Brook near the Dana Avenue Bridge, to the T