Boskalis’ trailing suction hopper dredger (TSHD) Gateway has been very busy these days adding over a million tons of beach material onto the Southsea beaches.
“ The Gateway has powered through pumping shingle to the west side of South Parade Pier and has now started on the eastern side ,” Southsea Coastal Scheme said.
