Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Dredging›Reviving Brazil’s Paraopeba River with Watermaster
Dredging

January 2, 2026 · about 6 months ago

Reviving Brazil’s Paraopeba River with Watermaster

In January 2019, a tailings dam collapsed in Brumadinho (a Brazilian municipality in the state of Minas Gerais), releasing a large volume of mining residues into the Paraopeba River. As part of the mining company’s recovery program, Construtora Vale Verde is now removing tailings from a 6 km stretch

2 minutes read
  • LinkedIn
  • X
  • Email
Reviving Brazil’s Paraopeba River with Watermaster

In January 2019, a tailings dam collapsed in Brumadinho (a Brazilian municipality in the state of Minas Gerais), releasing a large volume of mining residues into the Paraopeba River. As part of the mining company’s recovery program, Construtora Vale Verde is now removing tailings from a 6 km stretch of the river.

“ The toughest areas are where the water is very shallow, the banks unstable and road access is limited. To reach them without building new roads or other temporary works, the team uses an amphibious Watermaster Classic V – the first in Brazil ,” Watermaster/Aquamec said.

“It reaches and works in the most challenging sections of the river where the rest of the fleet cannot. The goal is to remove the tailings safely so the Paraopeba and the communities along it can recover.”

Watermaster’s first task is to open the shallow stretches of river sediment that block access to the tailings.

With its bucket, it clears these bars and creates the draft needed for the CSD and the excavators on barges to work. It also helps maintain the CSD’s discharge pipeline.

If large rocks are in the way, Watermaster breaks them with its hydraulic hammer to keep the way open for the larger units, the company said.

The CSD removes tailings by suction dredging the slurry through a pipeline to a dewatering area on land. On this stretch the pumping distance is about 3 km with 25 meters of lift using a booster.

Day by day, the Paraopeba River becomes clearer, safer and healthier as it returns toward its natural state, Watermaster/Aquamec concluded.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Dredging

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

11 days ago

Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

11 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

11 days ago
Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

11 days ago