The Scheldetunnel has reached another significant milestone with the opening of the doors between tunnel elements seven and eight.
For the first time, all eight elements are now internally connected, allowing teams from both riverbanks to walk the full length of the tunnel. Although the temporary bulkheads remain in place for the moment, the newly opened doors mark the transition toward a unified tunnel structure.
