A public meeting and webinar on the Lower Susquehanna River Watershed Assessment (LSRWA) report will be held today, from 7 to 9 p.m. at Harford Community College, Bel Air, MD, announced USACE. Since their construction, the reservoirs behind the three dams along the lower Susquehanna River (Holtwood,
Work on Brisbane Airport’s New Parallel Runway has reached an important milestone after the final load of sand to form the base was pumped onto the site over the weekend. Dredging began on June 4 and favorable weather over the last six months allowed the Belgian dredge ‘Charles Darwin’ to pump ashor
Egypt’s president, Abdel Fattah Al Sisi held a meeting yesterday with Supply Minister Khaled Hanafi and an expert committee concerned with a mega national project aimed at transforming Damietta Port into an international logistic hub for handling and storage of grain. Committee members reviewed deta
The removal of an underwater dam at the entrance to the Botlek (by port number 4030) has been completed successfully. The nautical guaranteed depth (NGD) was -5.60 meters NAP (New Amsterdam Water Level) and will now be -14.50 meters NAP. In total, the building consortium Boskalis/Van Oord dredged ov
The Ports and Harbours West Africa summit is scheduled for 26 – 28 January, 2015, in Kofi Annan International Peacekeeping Centre, Accra, Ghana. Formally supported by the Ghana Ports & Harbours Authority, the Ports and Harbours West Africa event will focus on operational and construction challenges
The U.S. Army Corps of Engineers, Philadelphia District, has just awarded a $128.17 million contract to Great Lakes Dredge and Dock, Co., LLC, Oak Brook, Illinois for the Long Beach Island shore protection project. GLDD won the contract, with options, for beachfill and completion of initial construc
Dredging operations are risky. They are large, sprawling with hidden dangers amongst heavy machinery. The International Association of Dredging Companies (IADC) members are committed to safeguarding their employees and to continuous improvement in guaranteeing a safe and healthy work environment. To
Phase one of Fleetwood’s £1.5m seafront facelift gets under way today with improvements to the marine lakes. The overall aim is to achieve consistent levels of water, so that a better range of sports and activities can be provided in the future. Work is due to start today (8 December) when the main
The Channel Safety Dredging Program in Geelong is near completion with the next phase scheduled to start today, December 8th, in the vicinity of the Corio Bay City Bend. This phase involves reinstalling four beacons which have been refurbished. The new positions of the beacons mark the wider City Be
U.S. Senator Robert Menendez and Congressman Bill Pascrell, Jr. (NJ-09) have recently praised the Federal Emergency Management Administration (FEMA) for reconsidering and approving Secaucus’ application for disaster recovery funding to repair damage to the Secaucus Public Safety Marina caused by Sup
Coasts & Ports 2015 Conference, an amalgamation of the 21st Australasian Coastal and Ocean Engineering Conference and the 14th Australasian Port and Harbor Conference, will be held in Auckland, New Zealand from 15 – 18 September 2015. The Coasts and Ports Conference series is the pre-eminent forum i
Last Friday, December 5, HKND Group met with leaders of various labor unions of Nicaragua discussing the economic progress and job opportunities that the Grand Canal Project will generate for the country. During the meeting, which was held at the the Secretariat of the Presidency, both sides agreed
Suez Canal Authority (SCA) chief Mohab Mamish yesterday inspected dredging works on the New Suez Canal project. Mamish hailed efforts exerted by the workers of the project and the progress they made so far. This development project is designed to enlarge the transit capacity and to increase industri
The Mohican River watershed in north-central Ohio is in good condition, according to an Ohio EPA draft water quality report about the watershed. The Agency is accepting comments on the draft report until January 5, 2015. Stream data was collected throughout the watershed in 2007. The draft report in