
Urgent sand replenishment works are now underway to restore the beach near Rockingham Street at West Beach, the City of Charles Sturt, SA, informs. Recent weather conditions including high tides and winds have escalated erosion of the dunes at the location, prompting the South Australian Government

Congressman Garret Graves (South Louisiana) released the following statement yesterday regarding a $3.2 million Center of Excellence Research Grant for the Coastal Protection and Restoration Authority of Louisiana (CPRA)’s partnership with the Water Institute of the Gulf (the Water Institute). The g

Royal Boskalis Westminster N.V. has just released this amazing video named ‘How we made our mark in the Markermeer lake’. In March 2016, Boskalis started work on the first stage of one of the largest nature restoration projects in western Europe – Marker Wadden. The project aimed to transform the ec

Water managers are continuously making decisions to guarantee water safety. These decisions relate to the short term, for example ongoing droughts or, precisely, when there is a risk of flooding. But they can also affect the long term given the more extreme events caused by climate change. All these

Louisiana Coastal Protection and Restoration Authority (CPRA) said in their latest announcement that the work is currently underway on the West Belle containment dikes. This scheme is a part of the Terrebonne Basin Barrier Island and Beach Nourishment project which will construct approximately 1,100

The U.S. Army Corps of Engineers, St. Paul District, in cooperation with the Flood Diversion Board of Authority, will continue its water quality field surveys for the Fargo-Moorhead flood diversion project starting this week. The primary objective of collecting the samples is to analyze water qualit

After almost 40 years of discussion and planning, Bridgeport Harbor Marina, just off Long Island Sound in Connecticut, is now open, Marina Dock Age reports. The marina – part of the Steelpointe Harbor development – is located on an old industrial/commercial site in Bridgeport. The site required dred

Damen Shipyards has just released this beautiful video about their DOP250 dredge pump on a wire crane, doing a beach replenishment job on the Mediterranean coast in Italy. Due to coastal erosion the beach in the Gulf of Follonica has diminished rapidly, said Damen. The DOP submersible dredge pump ha

The Pelletier Creek harbor dredging project, located in Morehead City, NC, was successfully wrapped up last week, the Carolina Coast Online reports. According to Morehead City Planning Director Sandi Watkins, the actual dredging work began on April 21 and was complete Tuesday. Final surveying work a

The Peel Marina dredging program, located in the town of Peel, Isle of Man, is moving forward according to schedule, Land & Water just announced. “As part of a large-scale project, we have constructed a temporary draining lagoon in a field upstream of the marina. Now, our team is using a long reach

The U.S. Army Corps of Engineers, Detroit District announced recently that a new dredging season has kicked off with the first contractor, Ryba Marine, mobilized for the season. According to the Corps, dredging began at the Pointe Mouillee Access Channel and East Outer Channel on the Fiscal Year 201

The U.S. Army Corps of Engineers, Jacksonville District, awarded the final contract for the cutoff wall required as part of the ongoing rehabilitation of the Herbert Hoover Dike (HHD), the earthen structure surrounding Lake Okeechobee. The Corps awarded the contract April 30, 2020 for $41.4 million

The U.S. Army Corps of Engineers, Kansas City District has released an update on the progress made in their levee rehabilitation program. As reported, there are 66 levee systems on target for repairs, some with breeches, some with other surface damage such as grass kill or scour holes. The Corps cur

HEB construction and Napier Port have restarted building Hawke’s Bay’s biggest wharf, which will allow the region to welcome more and larger ships. According to the port, HEB Construction are back on track to start piling this week. As mentioned in the March update, the wharf will be supported by ne