Dredge Yard develops new design for Water Ball Joint. These ball joints have been produced by using new innovative design developed by Dredge Yard’s team of engineers which makes it much more economical and suitable for transporting water. Water ball joint 700 mm is suitable for 10 bar working press
The Sunshine Coast Regional Council says the beach replenishment program is progressing well between Maroochydore and Alexandra Headland, reports abc.net.au. The Council announced a plan to test a new sand-pumping dredger which will add sand on the heavily eroded beaches at Maroochydore and Alexandr
Maersk McKinney Moller, the world’s largest container ship and first Triple-E class vessel, made a call at the Port of Tanjung Pelepas (PTP) on its maiden voyage from South Korea to Europe. PTP was the vessel’s last port of call in Asia before it journeys to Rotterdam in The Netherlands today. PTP c
The State Department of Transportation, Harbors Division is proposing infrastructure improvements to Kawaihae Harbor. The purposes of the proposed actions are to: serve existing and future demand for harbor facilities; ensure adequate berth lengths and yard space to accommodate multiple users with v
The first of hundreds of massive boulders will be moved into place at Kirra Point groyne today. Mayor Tom Tate said the work, to reinstate 30 metres of Kirra groyne that was removed in 1996, marks a significant milestone for one of the Gold Coast’s most iconic surf beaches. “The local surfing commun
The Brazilian Institute of Environmental and Renewable Natural Resources (IBAMA) has issued an operating license to Brasil Terminal Portuario (BTP) effective 19th, July 2013, marking an important milestone in the new port project and officially opening the terminal. “With this license we can now beg
ADPC has announced the next steps in its plans to support the growing cruise business at Zayed Port, Abu Dhabi. Figures for 2012/2013 show a total of 96 vessel calls and 155,000 passengers visited Zayed Port, Abu Dhabi last season. Increasing the cruise business to the city is one of Abu Dhabi’s mai
Vice President Kwesi Bekoe Amissah-Arthur at the weekend visited the Kwaprow community to inspect progress of work on the dredging of the Kakum River. The visit was a sequel to a similar one last year during which he sympathized with the people on a flood that affected the area, which claimed houses
The Australian Marine Conservation Society has slammed a new multi-million dollar advertising campaign by the Australian Petroleum Production and Exploration Association that will muddy the waters over the protection of special places like the Great Barrier Reef from massive industrialisation. APPEA
The Royal Irrigation Department (RID) has revealed that the construction of flood barriers along Rangsit Prayoonsak Canal has now been 80% completed and is expected to be fully operational at the end of August. According to Director of the Water Allocation and Drainage Planning of South Rangsit Irri
The major reconstruction of the Stone Harbor beachfront ends with two blocks of work in Avalon on the south side of town. On Sunday morning, July 28th, Norfolk Dredging announced that it has reached the Avalon border and will be doing final beach work at 79th Street and 80th Street in Avalo
The U.S. Army Corps of Engineers, Detroit District, awards a contract for dredging at Duluth-Superior Harbor in western Lake Superior on the Minnesota-Wisconsin border. The $1,393,900 contract was awarded to Roen Salvage Co., of Sturgeon Bay, Wis. The firm will dredge 114,000 cubic yards of material
U.S. Army Corps of Engineers, Jacksonville District, has introduced a plan for the Jacksonville Harbor area dredging program. This deepening work is located in the upper cuts through the Lower Terminal Channel of Jacksonville Harbor, Duval County, Florida. The base work under this contract includes
The Wells Harbour dredging program commenced this week, according to wellsharbour.co.uk. The dredger “Kari Hege” will be engaged in dredging operations in the Wells Harbour main channel north of buoy number 4 , between buoys 4 & 2. All material removed from the channel during dredging operation is b