Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Project & Tenders

Loading filters...
Business & FinanceVessels
The Concept of the Twin Dyke
Project & Tenders

The Concept of the Twin Dyke

The concept of the Twin Dyke in northern Netherlands is almost ready to prove itself, informs the Dutch Water Sector. Along the Wadden Sea, a 2.5 km long double levee section has been constructed. The area between the levees is now being designed with controlled sea water inflow for the farming of s

about 6 years ago
Carteret County Beachfill Almost Done
Project & Tenders

Carteret County Beachfill Almost Done

The Carteret County Shore Protection Office announced yesterday that they are right on track with the Phase II of the Post Florence Renourishment Project. Great Lakes Dredge & Dock and their hopper dredge Ellis Island have been working uninterrupted and completed the Pine Knoll Shores reach (“Reach

about 6 years ago
Poland to Complete Construction of CSD Willem van Rubroeck
Project & Tenders

Poland to Complete Construction of CSD Willem van Rubroeck

Jan De Nul Group’s biggest self-propelled cutter suction dredger was successfully loaded on board a semi-submersible transport vessel last week in Croatia, sending her to Poland for further completion of the construction works. “The semi-submersible vessel successfully loaded our Willem van Rubroeck

about 6 years ago
Komandoo Harbor Works in Full Swing
Project & Tenders

Komandoo Harbor Works in Full Swing

The extension of the existing harbor for Sh. Komandoo harbor upgrade project is well underway, reports the Maldives Transport and Contracting Company (MTCC). According to the latest update, current work involves quay wall works and dredging and reclamation of the harbor basin. MTCC also reported tha

about 6 years ago
Dredging the Brewerton Channel Eastern Extension
Project & Tenders

Dredging the Brewerton Channel Eastern Extension

Great Lakes Dredge and Dock of Oak Brook, Illinois, is making good progress dredging one of the channels associated with the Baltimore Harbor. According to the Army Corps, crews are currently dredging roughly 950k cubic yards of material from the Brewerton Channel Eastern Extension, ensuring continu

about 6 years ago
Carteret County Beachfill Operations Switch to Salter Path
Project & Tenders

Carteret County Beachfill Operations Switch to Salter Path

Trailing suction hopper dredge Ellis Island has been working non-stop this week on the beach nourishment project in Carteret County, NC. According to the county officials, Great Lakes Dredge & Dock has just completed the Pine Knoll Shores portion of the project. Now, the contractor will fully transi

about 6 years ago
WOSI Replenishment Project Complete
Project & Tenders

WOSI Replenishment Project Complete

Great Lakes Dredge & Dock Company announced today successful completion of a dredging project at Shinnecock Inlet on Long Island. Works on the $10.7 million West of Shinnecock Inlet (WOSI) emergency replenishment project started in early February. The area first experienced problems last October and

about 6 years ago
TSHD Vox Amalia Busy in Den Helder
Project & Tenders

TSHD Vox Amalia Busy in Den Helder

15 months after the trailing suction hopper dredger (TSHD) Vox Amalia was christened by the Dutch Queen Maxima, the vessel started its first job. This brand new hopper dredger is reinforcing the coastline by Den Helder, The Netherlands. The Vox Amalia has a length of 158 meters, a width of 36 meters

about 6 years ago
IJmuiden Sea Lock Project – Spring 2020 Update
Project & Tenders

IJmuiden Sea Lock Project – Spring 2020 Update

OpenIJ – a consortium of construction companies building the world’s largest sea lock in IJmuiden, the Netherlands – has released the spring update for this development project. According to the update, this spring, OpenIJ is going to asphalt part of the future public road near the guard wall and th

about 6 years ago
Converting General Cargo Vessel to Hopper Dredger
Project & Tenders

Converting General Cargo Vessel to Hopper Dredger

Last year, Holland Shipyards Group was selected by Faasse Dredging for the conversion of a general cargo vessel to a hopper dredger. After the acquisition, Faasse Groep and Holland Shipyards have come to an agreement on the conversion of former general cargo vessel Mandeo into the trailing suction h

about 6 years ago
Charleston Dredging Operations PHOTO
Project & Tenders

Charleston Dredging Operations PHOTO

Dredging operations are still underway in Charleston Harbor, ensuring the harbor is maintained for transporting goods in and out of the South Carolina Ports Authority. By 2021, Charleston will have the deepest harbor on the East Coast at 52 feet. This will ensure large container ships can access SCP

about 6 years ago
Carteret County Beachfill Moving Westward
Project & Tenders

Carteret County Beachfill Moving Westward

Despite a persistent southwest wind generating choppy seas past weekend, Great Lakes Dredge & Dock is making great progress in Carteret County. According to the county’s Shore Protection Office, GLDD dredge the Ellis Island has completed pumping sand in the eastward direction from the submerged pipe

about 6 years ago
Emerald Isle Beach Nourishment Starts Next Week
Project & Tenders

Emerald Isle Beach Nourishment Starts Next Week

The Town of Emerald Isle and the Carteret County Shore Protection Office have informed property owners that beach nourishment in western Emerald Isle is scheduled to begin the first full week of April. However, residents may have already observed pre-construction activities. Great Lakes Dredge & Doc

about 6 years ago
Second Week of Cape Jaffa Works
Project & Tenders

Second Week of Cape Jaffa Works

Cape Jaffa Marina is now in the second week of the facility closure and works are progressing as scheduled towards the placement of the submersible discharge pipe, the Kingston District Council announced today. According to the update, there are currently no anticipated delays, with works still aimi

about 6 years ago
  • 1
  • …
  • 20
  • 21
  • 22
  • …
  • 259