Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Technology

Loading filters...
Business & FinanceEquipmentVesselsEvents
New EC250E Crawler Excavator from Volvo CE (Germany)
Technology

New EC250E Crawler Excavator from Volvo CE (Germany)

A recent press event at Volvo Construction Equipment’s Konz facility has not only unveiled the company’s latest EC250E crawler excavator, but also gone behind the scenes at one of Germany’s ‘top national employers’. Journalists gathered in early April for a ‘Made in Germany’ event at Volvo Construct

about 12 years ago
Australia: AMCS Concerned Over Lack of Environmental Regulations
Technology

Australia: AMCS Concerned Over Lack of Environmental Regulations

Queensland’s lax environmental assessment practices continue to present threats to the environment and the economy, causing fears for how major development on the Great Barrier Reef will be managed, said the Australian Marine Conservation Society (AMCS). The Department of Environment and Heritage Pr

about 12 years ago
Australia: Another Step Forward for Port of Hastings Development
Technology

Australia: Another Step Forward for Port of Hastings Development

Detailed environmental and planning studies for the Port of Hastings container expansion will soon be underway with specialist consultants now appointed. Minister for Ports David Hodgett announced the milestone after a six month procurement period to ensure the right contractors were on board to dev

about 12 years ago
USA: Corps to Hold Workshops on Bull Shoals Lake Master Plan
Technology

USA: Corps to Hold Workshops on Bull Shoals Lake Master Plan

The Army Corps of Engineers’ Mountain Home Project Office will suspend shoreline activity requests for Bull Shoals Lake beginning May 23 until December 31, 2015 to establish a baseline of the lake for officials to use while revising its 40-year-old master plan. Shoreline activity requests will not b

about 12 years ago
QRC: GBR Facts to Fore in Advertising Campaign (Australia)
Technology

QRC: GBR Facts to Fore in Advertising Campaign (Australia)

Television commercials urging Australians to become informed about the true environmental health of the Great Barrier Reef will begin screening nationally tomorrow. The commercials are authorised by the Queensland Resources Council in the wake of an admitted ‘scaremongering’ campaign by environmenta

about 12 years ago
USA: Brewerton Channel Dredging Moves Ahead
Technology

USA: Brewerton Channel Dredging Moves Ahead

Dredging continues in the Brewerton Channel which leads to the Baltimore Marine Terminals through the Fort McHenry channel. Dredge 51 is currently manned and operated by Great Lakes Dredge and Dock from Oakbrook, Illinois, and will continue dredging the area over the next few months. The dredged mat

about 12 years ago
The Philippines: IMS Model 5012 LP Versi-Dredge at Work (VIDEO)
Technology

The Philippines: IMS Model 5012 LP Versi-Dredge at Work (VIDEO)

The City of Marikina dredging scheme is moving forward. In this video, an IMS Model 5012 LP Versi-Dredge is cleaning silt, sand, and debris from the waterway flowing through the city. The Versi-Dredge will deepen the river and help mitigate flooding events that have been notorious for damaging priva

about 12 years ago
DP World: New Channel Opens New Opportunities for Vietnam
Technology

DP World: New Channel Opens New Opportunities for Vietnam

In a significant milestone, DP World has welcomed the very first vessel to navigate the new channel on the Soai Rap River to its Saigon Premier Container Terminal (SPCT) in Hồ Chí Minh City, Vietnam. The MSC vessel Xutra Bhum, with a nominal TEU (twenty foot equivalent container unit) capacity of 23

about 12 years ago
The Netherlands: “Slurry Transport in Dredging and Wet Mining” Approaches
Technology

The Netherlands: “Slurry Transport in Dredging and Wet Mining” Approaches

The Training Institute for Dredging (TID) scheduled its advanced pump and slurry course named “Slurry Transport in Dredging and Wet Mining” for May 19-22, 2014, in their training facilities in Kinderdijk, the Netherlands. In this advanced, 4-day training, emphasis will be put on the hydraulic transp

about 12 years ago
VIDEO: Belmar Beach Receives New Sand (USA)
Technology

VIDEO: Belmar Beach Receives New Sand (USA)

The Belmar Beach replenishment program is currently underway. This project is part of an emergency shore protection project which will repair and restore previously constructed beach erosion control and storm damage reduction projects throughout the region affected by Hurricane Sandy. Once completed

about 12 years ago
Pakistan: Completion of Gwadar Port Extension Project on Priority Basis
Technology

Pakistan: Completion of Gwadar Port Extension Project on Priority Basis

Prime Minister Nawaz Sharif last week said that the Gwadar Port Extension Project should be given priority in order to boost economic activity in the country. The Prime Minister briefed the cabinet on his recent visit to China and the development projects finalized during the tour including Pakistan

about 12 years ago
Army Corps to Develop Plans for Fort Worth Channel (USA)
Technology

Army Corps to Develop Plans for Fort Worth Channel (USA)

The U.S. Army Corps of Engineers, Fort Worth District, commenced development of the plans and specifications design documents for the Fort Worth Central City by-pass channel. The 1.5 mile long and 300 foot wide channel is part of the overall Trinity River Vision Project. Design of the by-pass channe

about 12 years ago
USA: Meeting on Dallas Floodway Program Takes Place in May
Technology

USA: Meeting on Dallas Floodway Program Takes Place in May

The U.S. Army Corps of Engineers, Fort Worth District, recently posted the Draft Feasibility Report and Draft Environmental Impact Statement (EIS) for the Dallas Floodway Project for public review. Modifications to the existing Dallas Floodway Project were authorized in the Water Resources Developme

about 12 years ago
Picture of the Day: Coney Island Post-Sandy Restoration (USA)
Technology

Picture of the Day: Coney Island Post-Sandy Restoration (USA)

The U.S. Army Corps of Engineers is placing roughly 600,000 cubic yards of sand at Coney Island to replace sand lost during Hurricane Sandy and also to restore the Coney Island project to its original design profile. The Coney Island Reach project, which extends from West 37th Street to Brighton Bea

about 12 years ago
  • 1
  • …
  • 327
  • 328
  • 329
  • …
  • 471