Congressman Frank Pallone, Jr. (NJ-06) announced that the Army Corps of Engineers has awarded the contract for dredging Shoal Harbor and Compton Creek in Belford, New Jersey. The $2 million contract has been awarded to M.E.R.I.T. Inc., a small business located in Newark, New Jersey. The project will
Two waterways in Northern Brisbane will benefit from a $300,000 investment by the Queensland Government. Member for Clayfield Tim Nicholls said the funding would be delivered as part of the Queensland Regional Natural Resources Management Investment Program. “There is a one hectare zone of mangroves
Port of Rotterdam, Europe’s leading port, has signed a global partner deal with TOC Worldwide, organiser of the global TOC portfolio of port-centric maritime trade and supply chain events. The two partners said that the new agreement reflects a mutual commitment to foster greater dialogue and co-ope
The U.S. Army Corps of Engineers, New York District, in conjunction with the Town of Southold and the New York State Department of Environmental Conservation, announce the placement of nearly 100,000 cubic yards of sand replenishing severely eroded beaches to the east of Mattituck Inlet that will im
NSW Ports is set to undertake a major upgrade to facilities at Port Kembla to increase port and grain handling capacity. NSW Ports in conjunction with major Australian ASX listed logistics company Qube Holdings and commodities trader Noble Group, will jointly invest to upgrade the existing berth (Be
NAWAH Port Management (NPM), a business unit of North America Western Asia Holdings, has entered into a formal agreement with Iraq’s Ministry of Transportation and the General Company for Ports of Iraq to quadruple the size of its terminal operations at the Port of Basra (also known as Al Maqal Port
Proposals totalling more than £20m promising to help prevent significant flooding in the Levels and improve the county’s roads were unveiled by Somerset County Council today. At a news conference this morning, it was revealed that some of the biggest schemes could be started and finished this year –
The keel laying ceremony of two units of 20″ cutter suction dredgers at the Meghna Yard of Ananda Shipyard & Slipways Ltd. was held yesterday. Earlier, the Bangladesh Water Development Board (BWDB) signed two contract agreements with the joint venture organization Ellicott Dredges LLC. and Ananda Sh
The Slough Arm dredging project is set to start on April 21 and will be carried out by the Canal & River Trust. “We are aiming to dredge over 10,000 tonnes of silt, refuse and metal from the bottom of the Grand Union Canal in Slough to make it easier for boats to navigate along […]
The Fox River dredging operations for the 2014 season resumed last week. Work to remove shipwreck debris behind 1611 State St. in Green Bay, WI, is expected to be underway soon, and capping and covering operations will start in May. The Fox River Cleanup Project, designed to reduce risk to human hea
Construction started last year to stabilize a portion of the east bank of the White River in Augusta, Ark. Bank erosion has been occurring, threatening to wash away Augusta’s historic American Legion Hut, which is listed on the National Register of Historic Places, a city road, and a portion of the
The Lower Passaic River Study Area Cooperating Parties Group (CPG) announced that they are disappointed because the EPA has released its Focused Feasibility Study (FFS) and Proposed Plan, a massive, impractical, and disruptive bank-to-bank remedy for the lower eight miles of the River. EPA’s proposa
The U.S. Army Corps of Engineers and Truckee River Flood Management Authority are closer to moving forward with a $280.8 million plan to reduce flood risk along the Truckee River after Corps Commanding General Lt. Gen. Thomas P. Bostick signed off on the project April 11 at Corps headquarters in Was
CCCC Fourth Harbor Engineering Co., Ltd. has recently won the bid for construction of Berths 2-7 in Phase 2 of the container terminal project in Gaolan zone of Zhuhai Port, with construction period of 48 months. The project involves construction of six professional container berths and auxiliary fac