The City of Virginia Beach easement requiring dredging is selected and measured to plan maintenance and generate a map to communicate location. Rob Jessen, GIS Coordinator for the City of Virginia Beach, used Smart Client to select neighboring properties and generates a spreadsheet for a mail merge
The Canadian Land Reclamation Association (CLRA), Atlantic Chapter, in co-operation with Ducks Unlimited Canada and the Town of Sackville, NB, scheduled “The 6th Annual Atlantic Reclamation Conference ARC 2013″ for October 2-4, 2013, in Sackville, New Brunswick. The following themes will be covered
On September 4, IHC Merwede and its Training Institute for Dredging (TID) will organise the India Dredging Experience. This event will be held in the build-up to the 4th Annual Conference on Dredging in India, and offers visitors the opportunity to get acquainted with TID’s Cutter Simulator Training
For the 36th time Rotterdam opens the doors to Europe’s largest port during the annual World Port Days with a wide range of impressive vessels to visit and spectacular stunts on the water. On 6, 7 and 8 September 2013 Van Oord is present with a stand and one of the state-of-the art vessels, Artemis,
After successful commissioning and sea-trials in June, the backhoe dredger “Bucephalus” has recently commenced dredging works in Sardegna, Italy. With the commissioning of this dredger, Italian based civil contractor SOMIT s.r.l. has further strengthened its position as a versatile maritime contract
The extraordinary shareholders’ meeting of Ackermans & van Haaren NV has on 25 November 2011 renewed the powers delegated to the board of directors to redeem shares for a period of 5 years. In the framework of these powers, Ackermans & van Haaren has concluded a liquidity contract with Kepler Cheuvr
HKND Technical Team Conducts Field Inspections in Nicaragua HKND Group recently announced that it has engaged two leading global firms to provide specialized advice and expertise as the company continues its work on the technical feasibility study and route determination. Abducted Dredging Workers
The Port of Rotterdam is an open deep-water port in the river estuary Maas, and this location of the port necessitates maintenance dredging due to siltation ’attacks’ from both tidal current and river discharge. Siltation from the sea, coming in during the flood tide and how to build bitcoin mining
Reef Subsea has taken the step to restructure its business into two divisions – one being a new division focused on integrated subsea projects and the second a restructure of the Dredging & Excavation division. In the restructure, Reef Subsea Power & Umbilical and Reef Subsea Norway has merged to fo
CARIS has announced the release of CARIS HIPS and SIPS 8.1. The latest release of the leading hydrographic data processing system, which offers a single solution for bathymetry, seafloor imagery and water column data processing, includes significant improvements to the SIPS processing engine for sid
ASL Marine Holdings Ltd., an integrated marine company offering comprehensive services in shipbuilding, shiprepair and conversion, shipchartering and dredging engineering, reported revenue of S$465.4 million and net profit attributable to shareholders of S$45.3 million for the full year ended 30 Jun
The replenishment project officially ended on Avalon’s southern beaches on Wednesday, July 31st. This project comes at no cost to the taxpayers of Stone Harbor and Avalon and was completely funded by the federal government. The sand dredging operations are over and no more sand will be placed on the
The Local Organising Committee, the National Committee for Coastal and Ocean Engineering (Engineers Australia), PIANC Australia and the Institute of Professional Engineers New Zealand (IPENZ) scheduled the Coasts & Ports 2013 conference for 11-13 September 2013, in Novotel Sydney Manly Pacific. This
Great Lakes Shipyard has been awarded a contract by Whiskey Island Marina to fabricate a new floating breakwater. The Shipyard will fabricate two 150’ long steel cylindrical modules that will be bolted together and anchored in the lake bottom in front of the marina. The project is to be completed by