The official launch of the Cannington Flood Defense Scheme in Somerset, which reduces flood risk to 200 homes, took place on Wednesday, September 27. This is the first project to be delivered through the Somerset Design and Build Package by Team Van Oord (a joint venture of Kier Group Mackley Van Oo
The U.S. Army Corps of Engineers, Jacksonville District, announces the Tampa Harbor Maintenance Dredging contract award of $3.6 million to Coastal Dredging Company, Inc., of Hammond, Louisiana. The Corps awarded the contract September 22 and they anticipate that the construction will start in Novemb
The U.S. Army Corps of Engineers, Jacksonville District, awarded a $36.5 million contract to Norfolk Dredging Company on September 27 for the Pinellas County Beach Renourishment Project, part of the Pinellas County Storm Protection Project. Norfolk will renourish critically eroded shoreline in Pinel
The naming ceremony of DEME’s 7.950m³ LNG-powered trailing suction dredger Scheldt River will take place today in Zeebrugge, Belgium. The vessel, which was launched on 14 January at IHC’s shipyard in Krimpen aan den IJssel, is the second Royal IHC-built TSHD capable of operating on LNG. The first on
Port of Townsville announced this morning that the construction works on the port expansion program could start next year after the Environmental Impact Statement (EIS) for the project was approved by the Queensland Coordinator-General. The EIS included comprehensive scientific assessments and consu
DSC Dredge engineers were busy in Ikorodu, Lagos, Nigeria, in August, starting up the country’s largest dredge to date. The 24-inch (600 mm) Marlin Class dredge from DSC features two dredge pumps – a 24-inch pump located on the ladder and another 24-inch pump located on the dredge’s stern. The dredg
Work to improve an area serving as flood protection in the Morgan City area will soon begin with the provision of $2.7 million in funding from the Louisiana Coastal Protection and Restoration Authority (CPRA) toward engineering, design and construction costs. “CPRA is pleased to provide funding to S
The Office of Management and Budget (OMB) yesterday approved a request from the U.S. Army Corps of Engineers’ Norfolk District for $3M in reprogrammed funds that will go towards the Craney Island Eastward Expansion (CIEE) Project. This approval comes after a strong collaborative effort by Congressme
Great Lakes Dredge and Dock Co. (GLDD), from Oak Brook, Illinois, has won a $19.3 million contract for flood control and coastal emergency repair to the Delaware coast. Bids were solicited via the Internet with three received, the U.S. Department of Defense (DoD) said in their latest announcement. W
Restoration of the Sankey Canal, Britain’s first industrial canal, received a major boost thanks to the new Sankey Canal Partnership, formally launched at the yesterday’s conference at the World of Glass, St Helens. The Sankey Canal Restoration Society, the Canal and River Trust, plus St Helens, War
A coastal project to restore the lost beach in Puducherry is set to conclude by March 2018, said Shailesh Nayak, the former secretary and present adviser to the Union earth sciences ministry, the Times of India informs. Mr Nayak was in Puducherry on Tuesday and Wednesday, leading a team to review th
The City of Biloxi, MS, said in its latest announcement that the dredging work is currently underway at Point Cadet Marina. This cleanup scheme is part of a $711,000, year-long project that includes deepening of the Sherman L. Canaan Back Bay Fishing Dock, and canals at Hiller Park and three areas n
The U.S. Army Corps of Engineers’ Jacksonville District has awarded the final construction contract for the Kissimmee River Restoration Project, a massive Everglades restoration project in Okeechobee and Highlands counties. The $17.8 million S-69 Weir and Canal Backfill construction contract was awa
Rønne Havn A/S, the largest traffic and commercial port on the Danish island of Bornholm, announced last week that the port’s internal project team and management received ‘the last and final bids’ (BAFO) for the port expansion project. Thomas Thors, chairman of the board at Rønne Havn A/S, said: “I