Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Coastal Protection

Loading filters...
Beach NourishmentDredgingBreakwater ConstructionShoreline ErosionCoastal ErosionAuthorities & GovernmentEnvironment
The Folly Beach project nearly complete
Coastal Protection

The Folly Beach project nearly complete

The Folly Beach renourishment project in South Carolina will soon be complete, according to the Army Corps’ Charleston District. This major effort on Folly is improving the coastal defenses against mother nature, reducing the risk to life and infrastructure behind the dunes and bolstering resiliency

about 1 year ago
Bay County OK’s Mexico Beach renourishment project
Coastal Protection

Bay County OK’s Mexico Beach renourishment project

Bay County (FL) commissioners have just awarded a $27 million Mexico Beach renourishment project to Weeks Marine. The Mexico Beach Re-nourishment and Dune Restoration is first and foremost a shore protection project intended to provide critical storm protection for public and private infrastructure,

about 1 year ago
Magdalena Grand Beach gets new breakwater system
Coastal Protection

Magdalena Grand Beach gets new breakwater system

The Ministry of Works and Transport’s Coastal Protection Unit has completed construction of a breakwater system at the Magdalena Grand Beach and Golf Resort, Tobago. The scope of the project included construction of of three armour stone sills, construction of temporary access road and four emergent

about 1 year ago
Duval County shore protection project almost done
Coastal Protection

Duval County shore protection project almost done

The U.S. Army Corps of Engineers, Jacksonville District has reported great news for beach lovers – USACE Duval team expects Great Lakes Dredge & Dock to complete sand placement along the county shoreline this week. The team will have placed more than 1.3 million cubic yards of sand along the shore t

about 1 year ago
Mumbles Coastal Protection Scheme VIDEO
Coastal Protection

Mumbles Coastal Protection Scheme VIDEO

Knights Brown has just released this very interesting video about the Mumbles Coastal Protection Scheme. This project involves coastal protection works along Mumbles Promenade, near Swansea, UK. The improvement works will provide enhanced flood and coastal erosion protection to businesses and reside

about 1 year ago
GLDD bags $54.4M Long Beach Island nourishment contract
Coastal Protection

GLDD bags $54.4M Long Beach Island nourishment contract

Great Lakes Dredge & Dock (GLDD) has won a $54.4 million USACE contract for Long Beach Island nourishment project. Long Beach Island is an 18-mile long barrier island located in southern Ocean County, New Jersey. The area has historically suffered damages from coastal storms, hurricanes and nor’east

about 1 year ago
St. Augustine Beach project enters home stretch
Coastal Protection

St. Augustine Beach project enters home stretch

The U.S. Army Corps of Engineers, Jacksonville District continues to make great progress in completion of the emergency restoration beach nourishment project to A Street in St. Augustine Beach and wrapped up on Friday, 9 August. Focus will now turn to replacing some of the lost sand near and around

about 1 year ago
Latest update on Adelaide’s dredging and beach replenishment
Coastal Protection

Latest update on Adelaide’s dredging and beach replenishment

The state government is continuing to work at Henley Beach and West Beach in line with the recommendations of the independent Adelaide Beach Management Review. The final deliveries of quarry sand to Henley Beach are nearly complete. Sand delivery to replenish West Beach started on Monday 29 July. Al

about 1 year ago
Construction progressing on breakwater project in Oswego Harbor
Coastal Protection

Construction progressing on breakwater project in Oswego Harbor

The U.S. Army Corps of Engineers, Buffalo District, has just released the latest update on the Oswego Harbor breakwater program. Work continues at the Oswego breakwater as crews prepare 29,315 tons of armor stone to install on the breakwater. According to USACE, these massive stones are used to buil

about 2 years ago
St. Johns County updates on beach restoration projects (VIDEO)
Coastal Protection

St. Johns County updates on beach restoration projects (VIDEO)

St. Johns County Coastal Management recently shared how it manages more than 32 miles of eroded shoreline. Most funding for St. Johns County coastal projects is provided by federal and state grants and tax dollars paid by tourists. The County recently announced it will receive $4.75 million from the

about 2 years ago
ASBPA presents 2024 Best Restored Shores Awards
Coastal Protection

ASBPA presents 2024 Best Restored Shores Awards

The American Shore and Beach Preservation Association (ASBPA) has announced the winners of the 2024 Best Restored Shores Awards. ASBPA established its Best Restored Shores awards program to recognize and encourage more effective coastal risk management that restores natural infrastructure to address

about 2 years ago
Grand Isle Beach getting new sand
Coastal Protection

Grand Isle Beach getting new sand

Dredge General MacArthur is making great progress at the Grand Isle Dune and Beach Restoration Project. Sand is currently being dredged and placed along the existing beach to restore and repair the area previously damaged by Hurricane Ida. This collaborative effort between Louisiana Coastal Protecti

about 2 years ago
$6.21M awarded for resilience projects in North Carolina
Coastal Protection

$6.21M awarded for resilience projects in North Carolina

The North Carolina Department of Environmental Quality’s Division of Coastal Management (DCM) is awarding 20 grants to 19 communities for Phases 3 and 4 of the Resilient Coastal Communities Program (RCCP). A total of $4,310,350 will be available to complete 15 projects in Phase 3. Most of these engi

about 2 years ago
Boskalis developing new Building with Nature solution for coastal protection
Coastal Protection

Boskalis developing new Building with Nature solution for coastal protection

Protecting coastal areas and islands against rising sea levels and the forces of waves requires big equipment and major work. But before interfering in an existing ecosystem, people naturally want to know whether the measures they have devised will hold up in practice. With that in mind, Boskalis re

about 2 years ago
  • 1
  • …
  • 24
  • 25
  • 26
  • …
  • 36