Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Equipment

Loading filters...
Business & FinanceTechnologyVessels
Lamong Bay Terminal Opens
Equipment

Lamong Bay Terminal Opens

The Lamong Bay Terminal in Surabaya, East Java, Indonesia, was inaugurated this morning by the President of Indonesia, Joko Widodo. It was an historic moment for Indonesia, an important milestone in the country’s transport development program that is improving the movement of goods through its vast

about 11 years ago
Deltares’ Engineer Wins Best Paper Student Award
Equipment

Deltares’ Engineer Wins Best Paper Student Award

Kees Nederhoff, coastal engineer at Deltares has won the best paper student award for his work “Modelling the Effects of Hard Structures on Dune Erosion and Overwash”. The award was handed over to Kees during the Coastal Sediments 2015 conference, held in San Diego, CA, USA. Kees investigated the mo

about 11 years ago
VIDEO: New Cutterhead from Dragflow
Equipment

VIDEO: New Cutterhead from Dragflow

DRAGFLOW, an Italian company specialized in solid pumping solutions, has supplied a new cutterhead DTM85, with hydraulic pump (HY85HC), for a beach reclamation project in Bibione, Italy. This piece of dredging equipment is a custom engineered system and can be used with every DRAGFLOW ‘s hydraulic p

about 11 years ago
Shipping of the Dredger
Equipment

Shipping of the Dredger

First Global Logistics and Europe Cargo, both members of Project Cargo Network, have recently collaborated on the project cargo shipment of a dredger and its equipment from Alexandria to Antwerp. The dredger had finished its work at Sokhna Port and all the parts and equipment had to be shipped back

about 11 years ago
New Suez Works Gear Up for Final Phase
Equipment

New Suez Works Gear Up for Final Phase

Van Oord’s trailing suction hopper dredger “Utrecht”, the first addition to the dredging fleet already working on the New Suez Canal project, has just passed the Strait of Hormuz and is on its way to Suez. The vessel, with a capacity of 16,000 m³, is the first of two giant dredgers that will help in

about 11 years ago
More Money for Lower Myall River Restoration
Equipment

More Money for Lower Myall River Restoration

Great Lakes Council has been successful in attracting Federal and State funding for a triple header project that will restore parts of the Lower Myall River whilst rehabilitating Corrie Island and replenishing the sand at erosion hotspot, Jimmys Beach. The project is being heralded by both Tea Garde

about 11 years ago
Boskalis Selects Infor CloudSuite
Equipment

Boskalis Selects Infor CloudSuite

Infor, the industry cloud company, today announced that Boskalis, a provider of dredging and maritime solutions, has selected Infor CloudSuite™, a fully integrated, cloud-based solution suite delivering leading-edge core ERP, integration, social, and analytic capabilities. Boskalis has transitioned

about 11 years ago
Busy Start of 2015 for DEME
Equipment

Busy Start of 2015 for DEME

Ackermans & van Haaren, a diversified group active in 5 key segments: Marine Engineering & Infrastructure (DEME,one of the largest dredging companies in the world), Private Banking, Real Estate, Leisure & Senior Care, Energy & Resources and Development Capital, has announced their business results f

about 11 years ago
VIDEO: Sacyr’s Role in Panama Canal Project
Equipment

VIDEO: Sacyr’s Role in Panama Canal Project

Sacyr Vallehermoso, S.A., a Spanish construction company based in Madrid, has released a video about the Panama Canal Expansion Project. Sacyr is part of Grupo Unidos por el Canal, S.A. (GUPC), the main contractor responsible for the design and construction of the Panama Canal’s third set of locks.

about 11 years ago
GPA OKs $141.8M in Infrastructure Improvements
Equipment

GPA OKs $141.8M in Infrastructure Improvements

The Georgia Ports Authority board has approved $141.8 million in capital improvements with passage of its fiscal year 2016 budget. To upgrade existing assets, the board allocated $33.4 million to improve power infrastructure for cranes, paving, increased rail capacity and other terminal improvements

about 11 years ago
Canal Tugs: The Next Generation
Equipment

Canal Tugs: The Next Generation

Engineering Class ‘Telford Rolt’, a new 6.17 meter, 6.25 tonne tug, was launched into the River Soar at Loughborough this month with a naming ceremony performed by Charlotte Wood, Regional Construction Manager South at Canal & River Trust, a major customer of Land & Water Services Ltd. Designed by I

about 11 years ago
USV for Hydrographic Survey
Equipment

USV for Hydrographic Survey

Technology developed to help Marines plan for amphibious operations in now assisting the U.S. Army Corps of Engineers with collecting hydrographic survey data in areas not easily accessed by a manned vessel. Developed by the Corps’ Engineer Research and Development Center in Vicksburg, Mississippi,

about 11 years ago
Photo Update: Suez Dredging Almost 70% Complete
Equipment

Photo Update: Suez Dredging Almost 70% Complete

Construction works on a multi-billion dollar New Suez Canal project, which will expand the existing Suez Canal, are nearing its completion. Egyptian President Abdel Fattah el-Sisi said two days ago that dry digging in the canal is 100 percent completed while dredging work is 65 percent finished. The

about 11 years ago
VIDEO: Production of Dredge Yard Valves
Equipment

VIDEO: Production of Dredge Yard Valves

Dredge Yard recently delivered dredge valves of sizes 600, 700 and 750 mm internal diameter, needed for the discharge pipeline on board of two trailing suction hopper dredgers. Fabrication was done in-house at Dredge Yard’s production facilities. The body of the dredge valve was fabricated from high

about 11 years ago
  • 1
  • …
  • 170
  • 171
  • 172
  • …
  • 475