The United Kingdom’s Secretary of State for Defense, Michael Fallon, inspected the dredging operations at the Portsmouth Naval Base this morning. In June, the Defense Infrastructure Organization (DIO) announced it had awarded a contract worth £31 million to Fareham based Boskalis Westminster Ltd for
The Port of Salalah, an Arab Gulf regional gateway port and transshipment hub on the Arabian Sea, has inaugurated a new deep-water General Cargo and Liquid Bulk Terminal, adding 20 million tons of dry cargo and six million tons of liquid bulk cargo annual handling capacity. The 1266 meter quay offer
The Jan De Nul’s cutter suction dredger Fernao de Magalhaes arrived in Saint-Nazaire on 10th December for a series of repairs. These operations, including sheet metal work, geo-mechanical inspections and the renovation of the hull, will be carried out by Eiffel Industrie Marine (EIM) in the Louis Jo
Broward County Commissioner, Chip LaMarca, will host a public meeting on the Shore Protection Project for Segment II: Pompano Beach, Lauderdale-by-the-Sea and Fort Lauderdale, on Wednesday, December 16, 2015, in Fort Lauderdale, FL. Representatives from the project contractor will be on-hand to answ
The latest stage of the transformation of Walthamstow Wetlands into the largest wetland nature reserve in London will see the creation of new reed beds to help preserve water quality and improve wildlife habitats. The wetlands site will remains one of Thames Water’s biggest sources of supply for Lon
Ocean City Mayor Jay Gillian said in his weekly address that the north end beach replenishment project is progressing nicely and, weather permitting, will be finished before Christmas. Great Lakes Dredge and Dock Company has rebuilt the dunes in the 5th Street area and is pumping sand in the area of
The America’s WETLAND Foundation (AWF) hosted members of the media on a site visit of its Gulf Intracoastal Waterway (GIWW) Shoreline Stabilization and Restoration Project last week. This restoration scheme is located on private land along the GIWW, serving as a model of cooperation for helping to s
New York State Senator Tim Kennedy and New York State Assemblyman Sean Ryan joined City of Buffalo Mayor Byron Brown last week to announce nearly $1.9 million in funding to help clean up and improve the water quality of Scajaquada Creek. The Buffalo Sewer Authority will be receiving $1,815,000 from
Across the Great Lakes several efforts have been undertaken to restore historic rocks reefs providing improved spawning grounds for a variety of fish species. Projects in the St. Clair-Detroit River System, Grand Traverse Bay and Thunder Bay have restored reef spawning habitat for lake trout, walley
The Rockefeller University formally broke ground last week on a project that will repair, and ultimately refurbish, a crumbling seawall and dilapidated stretch of public parkland along the East River. Initial work on the project will rehabilitate the seawall that supports the esplanade, spanning fro
Construction should begin by this summer on a $40.2 million raw water storage impoundment for the City of Savannah as part of environmental mitigation for the Savannah Harbor Expansion Project. The U.S. Army Corps of Engineers, Savannah District, awarded Thalle Construction Company of Hillsborough,
Dredging Today brings you an overview of the most popular stories from the past week (December 7-13). Mteck Delivers Electric Dredge Crane for Van Oord Mteck BV, a Dutch based builder of custom cranes for dredging and stevedoring industries, has just delivered an electric dredge crane for Paans Va
Takoradi Port is currently undergoing major infrastructure development to be at par with international standards as well as to meet needs of maritime trade activities. This development project, when completed, will provide adequate berthing, mooring, wharf, warehousing and large open space facilitie
The Town of Rockport’s project to repair and improve the upper Pigeon Cove stone breakwater and the harbor entrance breakwater has officially begun. Work at the Upper Breakwater includes construction of an access road along the breakwater for resetting and replacing stone and base material at discre