DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Business & Finance

Loading filters...
EquipmentTechnologyVesselsEventsProject & Tenders
New Suez Works Gear Up for Final Phase
Business & Finance

New Suez Works Gear Up for Final Phase

Van Oord’s trailing suction hopper dredger “Utrecht”, the first addition to the dredging fleet already working on the New Suez Canal project, has just passed the Strait of Hormuz and is on its way to Suez. The vessel, with a capacity of 16,000 m³, is the first of two giant dredgers that will help in

about 11 years ago
IADC Webinar on Dredging Equipment in June
Business & Finance

IADC Webinar on Dredging Equipment in June

The International Association of Dredging Companies (IADC) has announced that their webinar, named ‘Dredging Equipment: Its Evolution, Capabilities and Importance for Maritime Infrastructural Works’, is scheduled for Wednesday, June 17, 2015, at 14.00 hrs (CEST, Central European Summer Time). The we

about 11 years ago
More Money for Lower Myall River Restoration
Business & Finance

More Money for Lower Myall River Restoration

Great Lakes Council has been successful in attracting Federal and State funding for a triple header project that will restore parts of the Lower Myall River whilst rehabilitating Corrie Island and replenishing the sand at erosion hotspot, Jimmys Beach. The project is being heralded by both Tea Garde

about 11 years ago
EPA Releases Pompton Lake Dredging Plan
Business & Finance

EPA Releases Pompton Lake Dredging Plan

The U.S. Environmental Protection Agency yesterday released its final plan to remove mercury contamination from areas of Pompton Lake in Pompton Lakes, New Jersey, including the areas where the Acid Brook flows into the lake, called the Acid Brook Delta. These areas are collectively referred to as t

about 11 years ago
FONSI for Decomp Physical Model Now Available
Business & Finance

FONSI for Decomp Physical Model Now Available

The Draft Supplemental Finding of No Significant Impact (FONSI) for the Decomp Physical Model (DPM) is now available for public and agency review. Comments will be accepted through June 18, 2015. The Decomp Physical Model is a field-scale test that is being conducted along a 3,000-foot stretch of th

about 11 years ago
Columbia River Restoration Act Introduced
Business & Finance

Columbia River Restoration Act Introduced

Oregon’s Senator Jeff Merkley, Representative Earl Blumenauer, Senator Ron Wyden, Representative Suzanne Bonamici and Representative Peter DeFazio yesterday introduced the Columbia River Basin Restoration Act. The legislation would authorize $50 million over five years for the Environmental Protecti

about 11 years ago
Boskalis Selects Infor CloudSuite
Business & Finance

Boskalis Selects Infor CloudSuite

Infor, the industry cloud company, today announced that Boskalis, a provider of dredging and maritime solutions, has selected Infor CloudSuite™, a fully integrated, cloud-based solution suite delivering leading-edge core ERP, integration, social, and analytic capabilities. Boskalis has transitioned

about 11 years ago
Sediment Control Workshop Set for August 27
Business & Finance

Sediment Control Workshop Set for August 27

The Waikato Regional Council has announced that the Planning Erosion and Sediment Control (ESC) Workshop will be held on Thursday, 27 August 2015, in Hamilton, New Zealand. A one-day workshop will cover best practice erosion and sediment control methods in accordance with the Waikato Regional Counci

about 11 years ago
Cowes Breakwater Presentation at Annual Meeting
Business & Finance

Cowes Breakwater Presentation at Annual Meeting

Cowes Harbour Commission Chairman Roger Mathias, together with the Commissioners, will be present at the Annual Public Meeting on May 21st where the Harbour Master Capt. Stuart McIntosh will give a short presentation on CHC’s Annual Report for 2014-2015 and the Breakwater Project. The Harbour Master

about 11 years ago
Picture of the Day: North Topsail Beach Project
Business & Finance

Picture of the Day: North Topsail Beach Project

The fifth phase of the North Topsail Beach Shoreline Protection Project is moving ahead. Construction works, undertaken by Norfolk Dredging Company, started in late 2014 near 3588 Island Drive with the aim to reach the Surf City line. Sand for this restoration project is being taken offshore of Nort

about 11 years ago
More Dredging at Jurong Terminal
Business & Finance

More Dredging at Jurong Terminal

Maritime and Port Authority of Singapore (MPA) has informed the shipping, harbor craft and pleasure craft communities in Singapore’s waters that the working period for upgrading works at Jurong Terminal Berth J10 and J11 has been extended. According to MPA’s Port Marine Notice, these operations will

about 11 years ago
Senate Adopts Dredging Bill
Business & Finance

Senate Adopts Dredging Bill

The North Carolina Senate yesterday passed the SB 160 (Enhance Safety & Commerce for Ports/Inlets) legislation that will addresses the issue of open and navigable channels at the state’s inlets and ports. Senator Bill Cook, Senator Harry Brown and Senator Michael V. Lee are the primary sponsors of t

about 11 years ago
USACE Works on Mississippi River Channel Study
Business & Finance

USACE Works on Mississippi River Channel Study

The U.S. Army Corps of Engineers, New Orleans District, is planning to prepare a Draft Supplemental Environment Impact Statement (EIS), integrated with a General Reevaluation Report, for the Mississippi River Ship Channel, Gulf to Baton Rouge, Louisiana, General Reevaluation Study. The study will in

about 11 years ago
Four Drilling Rigs in Nigg Bay, Aberdeen
Business & Finance

Four Drilling Rigs in Nigg Bay, Aberdeen

Aberdeen Harbor said that four drilling rigs, currently located at Nigg Bay, are carrying out Site Investigation Work aimed at providing further information for the Harbor Development Project. Keith Young, Aberdeen Harbor Board’s Engineering Director, explained: “The four drilling rigs will be carry

about 11 years ago
  • 1
  • …
  • 952
  • 953
  • 954
  • …
  • 1707