Officials from the City of Tybee Island (GA) and the Army Corps yesterday, August 29, signed a $13 million beach replenishment deal that will lead to more sand on the island community’s beach for additional protection from future storm damage. The deal for the third renourishment project in the last
The U.S. Army Corps of Engineers and non-Federal Sponsor, Miami-Dade County, will be the organizers of an informational public meeting on the Miami-Dade County Back-Bay Coastal Storm Risk Management Feasibility Study. USACE and the county will host this meeting September 10, from 5-7 p.m. at the Nor
Great Lakes Dredge & Dock Corporation (GLDD) has successfully completed the Nags Head beach nourishment project. The beach nourishment sand pumping operations were completed early on Sunday morning, August 18, 2019 in the 8200 block of South Old Oregon Inlet Road near Mile Post 17, reported the town
Federal, state and local leaders joined together on August 28 to break ground on the first phase of construction of the Upper Llagas Creek Flood Protection Project. “When completed, this project will provide flood protection for residents, businesses and farming areas of southern Santa Clara County,
The NSW Roads and Maritime Services has just announced that Coffs Harbor, Inner Entrance dredging campaign is officially underway. The contractor, Dredging Solutions Pty Ltd. started the interim dredging of the harbor inner entrance on Monday, 26 August 2019. The dredging operation will involve the
International Association of Dredging Companies (IADC) recently released a new article titled “Numerical investigation of the head and unsteady flow characteristics of a dredge pump loading high-concentration sands”. The article presents research which numerically simulates the unsteady water flow a
The United Soybean Board (USB) recently announced a $2 million allocation to help offset the planning, design, and research costs of deepening the lower Mississippi River from 45 ft. to 50 ft. As the USB reported, the 256-mile stretch of the Mississippi River from Baton Rouge, Louisiana, to the Gulf
Jenkins Marine Ltd is about to begin a routine maintenance dredging project within Haslar Marina Gosport and the RNSA pontoon, informs the Queen’s Harbor Master Portsmouth. According to the notice, the maintenance dredging will begin within Haslar Marina Gosport and the RNSA pontoon (located to the
Planning is underway to remove the dock and jetty at the Rayonier Mill Site in Port Angeles Harbor, reports the Washington State Department of Ecology. They announced that residents, in late August, will see some field survey work taking place at the dock and shoreline area leased by Rayonier Advanc
Australia’s largest backhoe dredge – the giant Woomera has been busy lately clearing the hard clays from the Trinity Inlet. The Ports North this morning released a video showing the backhoe dredge Woomera working near the Port of Cairns wharves as part of the dredging for the Cairns Shipping Develop
The FM Area Diversion Authority and the City of Horace have approved a partnership to mitigate the impact of activities associated with the Diversion Project within and adjacent to the city. Earlier this month, the Diversion Authority offered a cost-share agreement to the city for appropriate infras
The Environment Agency earlier today presented the latest update on the Exmouth tidal defense scheme. The EA reported that work continues on defense wall and revetment at Royal Avenue, piling and gabions at Camperdown Creek and improvements to the sea wall along the seaward side of the Esplanade. Th
IADC today announced the fourth nomination running to receive the Safety Award 2019 award – Jan de Nul’s Full Mission Simulator safely prepares crews for risky conditions at sea. The Full Mission Simulator (FMS) is a 360° simulator of a dredger’s bridge where real situations can be practiced in a sa
Ukrainian Sea Ports Authority (USPA) has just announced the completion of dredging operations in the Port of Kherson. According to USPA, the contractor – SMD Invest LLC removed over 400,000m³ of dredged material from the port’s berths and the operational areas. Following the completion of dredging,