Congressman Emanuel Cleaver II announced yesterday that funding has been provided by the U.S. Army Corps’ Fiscal Year 2017 work plan to complete the Blue River Basin/Dodson Levee and the Turkey Creek Basin projects in the Kansas City area. “This was a long standing effort and I’m pleased to help wit
The Canal and River Trust has recently completed a major project that will make it easier for boat owners and holidaying tourists to visit Wiltshire’s Kennet and Avon Canal this summer. Over the past six months, the trust has been dredging the canal and has removed 17,000 tonnes of silt. Paul Fox, f
Port of Dover has just released this very interesting time-lapse video which covers the start of the Dover Western Docks Revival (DWDR) marine civil engineering construction over a six-month period (Jan 2017 – June 2017). The principal contractor, VSBW – a joint venture between VolkerStevin and Bosk
Boskalis Westminster is continuing dredging operations in Aberdeenshire under the £50 million Peterhead Inner Harbor Redevelopment Project. The scheme, largest development in the history of the port, was awarded to a joint venture partnership between civil engineering contractor, McLaughlin & Harvey
Emergency dredging work on the Ettalong Channel, set to remove about 5000 cubic meters of sand from the waterway, is officially underway at the southern end of Lobster Beach. “Further to my announcement on Friday, the emergency dredging being funded by the NSW State Government has commenced as sched
Congresswoman Louise Slaughter yesterday announced that the U.S. Army Corps of Engineers will complete dredging at Rochester Harbor this week. This season’s dredging operation included removal of over 180,000 cubic yards of material from the Port of Rochester and 5,000 cubic yards from Irondequoit B
U.S. Senators Charles Schumer and Kirsten Gillibrand yesterday announced $1.1 million in federal funding for the NYS Department of Environmental Conservation (DEC) through the Environmental Protection Agency’s (EPA) Great Lakes Restoration Initiative (GLRI). The DEC will use these vital resources to
The U.S. Army Corps of Engineers, Savannah District, has just released the Savannah Harbor Expansion Project (SHEP) sub-project video update for June 2017. According to the Corps, SHEP gained more traction in June. Several features are on schedule to be completed by the end of 2017, including First
The U.S. Army Corps of Engineers, Los Angeles District, is inviting comments on a proposed shoreline stabilization project which includes a 140 foot long by 20 foot wide concrete seawall along the bluffs and coastline in the City of Solana Beach, California. “The development would protect the above
The U.S. Army Corps of Engineers, Vicksburg District, recently awarded Riley Bridge Co., Inc. of Russellville, Alabama, a $2.3 million contract for work on a section of levee at Mississippi Highway 465. The work consists of replacing the gravel surface of the levee with an asphalt surface on the cro
The Central Dredging Association (CEDA) has announced that the 10th International SedNet Conference will take place from 14-17 June 2017, at the Palazzo San Giorgio in Genoa, Italy. The conference, named ‘Sediments on the Move’, refers to the fact that sediment moves from the mountains to the sea an
J.E. McAmis, a California based heavy-civil, marine and environmental contractor, has won the Mouth of the Columbia River (MCR) 2017 North Jetty Rehabilitation Project. In continuation of interim repairs completed also by McAmis in 2015, the basic repair template for the 2017 MCR North Jetty Rehabil
The coastlines of Puducherry and the neighboring Tamil Nadu have suffered from severe coastal erosion due to natural and anthropogenic activities. Short term measures like seawalls and groin field were attempted by the Puducherry government but the erosion problem shifted further north, with increas
The Tanzania Ports Authority (TPA) and China Harbor Engineering Company Ltd (CHEC) have signed a $154 million contract for the Dar es Salaam port expansion program. Under this capital development scheme, which will be implemented in the next three years, berths No 1-7 will be strengthened and deepen